Pavidur AM-ECO
TO
APPLICATIONS
Surface fixative and binder in mass, for the union of crushed aggregates. Water permeable. Avoid puddled water. In roundabouts, terraces, pedestrian streets, sidewalks, swimming pools, crown trees ... Without maintenance.
OBSERVATIONS
Does not yellow. Do not add water or any additive to the mixture. Treat the singular areas (fissures) with the appropriate mesh. The drying time will vary depending on the ambient temperature and existing humidity. Do not apply with the risk of rain, frost, significant temperature changes, direct insolation, strong wind ... Always have tarpaulins to protect the pavement in case of emergency (rain, ice, extreme temperatures ...) so that it does not lose performance. On an existing concrete base: consult. Dosage: GRANULOMETRY DOSAGE 3 - 5 mm 7% x kg of aggregate 5 - 9 mm 5% x kg of aggregate 9 - 12 mm 4% x kg of aggregate
EMPLOYMENT CHARACTERISTICS
Application temperature measured on the pavement: 5 - 30ºC. Pot life (20ºC): 1 - 2 hours Thickness: between 3 and 6 cm Dry to the touch: 5 hours Total drying: 24 hours (3 cm / 20ºC) Time in service:> 2 days
* These times may vary depending on the ambient temperature and thickness.
APPLICATIONS
Surface fixative and binder in mass, for the union of crushed aggregates. Water permeable. Avoid puddled water. In roundabouts, terraces, pedestrian streets, sidewalks, swimming pools, crown trees ... Without maintenance.
FINISHES
According to the aggregates letter
RECOMMENDATIONS FOR APPLICATION
Always respect the same percentage of Pavidur 1 C. during mixing. Do not add water to the product. Respect the expansion, perimeter and retraction joints. Application temperatures 5ºC to 30ºC.
EXECUTION CONDITIONS
On soil with topsoil partially removed, leveled and eventually consolidated, sanitized by drainage with an anti-pollution layer complying with the compaction required by the project or construction management. The existing support must be resistant, healthy, free of dust, paints, oils ... In the case of applying on new concrete, it must be completely set (≥28 days) and with the appropriate slopes for water evacuation.