Escríbeme un Whatsapp
  • Adhesive epoxy fixative for aggregate bonding

Pavidur AM-ECO

€43.20
Tax included
Ask a question (0)
Capacity
Quantity

PAVIDUR AM-ECO - A glomer in mass, for the union of sand and crushed aggregates.
YELLOW, ONLY SUITABLE FOR GRAINS WITH BROWN OR YELLOW TONES-
Suitable for making pavements with road traffic
Water permeable. Packaging: 5 and 25 Kg.

TO

APPLICATIONS

Surface fixative and binder in mass, for the union of crushed aggregates. Water permeable. Avoid puddled water. In roundabouts, terraces, pedestrian streets, sidewalks, swimming pools, crown trees ... Without maintenance.

OBSERVATIONS

Does not yellow. Do not add water or any additive to the mixture. Treat the singular areas (fissures) with the appropriate mesh. The drying time will vary depending on the ambient temperature and existing humidity. Do not apply with the risk of rain, frost, significant temperature changes, direct insolation, strong wind ... Always have tarpaulins to protect the pavement in case of emergency (rain, ice, extreme temperatures ...) so that it does not lose performance. On an existing concrete base: consult. Dosage: GRANULOMETRY DOSAGE 3 - 5 mm 7% x kg of aggregate 5 - 9 mm 5% x kg of aggregate 9 - 12 mm 4% x kg of aggregate

EMPLOYMENT CHARACTERISTICS

Application temperature measured on the pavement: 5 - 30ºC. Pot life (20ºC): 1 - 2 hours Thickness: between 3 and 6 cm Dry to the touch: 5 hours Total drying: 24 hours (3 cm / 20ºC) Time in service:> 2 days

* These times may vary depending on the ambient temperature and thickness.

APPLICATIONS

Surface fixative and binder in mass, for the union of crushed aggregates. Water permeable. Avoid puddled water. In roundabouts, terraces, pedestrian streets, sidewalks, swimming pools, crown trees ... Without maintenance.

FINISHES

According to the aggregates letter

RECOMMENDATIONS FOR APPLICATION

Always respect the same percentage of Pavidur 1 C. during mixing. Do not add water to the product. Respect the expansion, perimeter and retraction joints. Application temperatures 5ºC to 30ºC.

EXECUTION CONDITIONS

On soil with topsoil partially removed, leveled and eventually consolidated, sanitized by drainage with an anti-pollution layer complying with the compaction required by the project or construction management. The existing support must be resistant, healthy, free of dust, paints, oils ... In the case of applying on new concrete, it must be completely set (≥28 days) and with the appropriate slopes for water evacuation.

50930

Specific References

ean13
8435802004604
New product


Be the first to write your review !

No customer questions for the moment.


Your Question has been successfully sent our team. Thanks for question!
Ask a question
hide form
Captcha